Hello everyone
After a first 607 3.0L V6 Phase I then a time in 806 HDI, I come back with a 607.
It's a phase II 2.2L petrol
Obsidian Black
Date of February 2005 with a total of 124200kms
The 1st modification was to cover the burr walnut parts with a brushed aluminum film.
Then I replaced the RT3 with an RT6
Don't look at the dirt on the carpet, it's at the end of the mods!!
Now you have to drain the BVA and do the distribution and accessories
Then will come a good blow of polisher, because she needs it!!
@++